Home Upgrade Specialist
Home Upgrade Planner Back to HVAC Planner
Free HVAC sizing tool for Los Angeles homeowners

Manual J HVAC Load Calculator

Build a more useful preliminary heating and cooling load estimate using the property details that actually affect HVAC sizing, including insulation, windows, solar exposure, infiltration, ducts and ventilation.

No equipment pricing Detailed building inputs HUS Planner lead system Formal Manual J review available after field verification
1Property
2Envelope
3Windows + Air
4Contact + Result
Step 1 of 4

Tell us about the property

Start with the basics. If the exact address is not available, enter the city or a nearby major cross street so HUS can still review the project.

Start typing and choose a suggestion, similar to the HUS Planner. You can also type an address manually. If you do not know the exact address, use a city or nearby major cross street.
Start typing to see address suggestions. Manual entry still works if needed.
The indoor floor area the HVAC system will heat and cool. Do not include an unconditioned garage, attic or patio.
How many levels are heated or cooled by this system.
Manual J uses bedrooms as one input for a reasonable occupant load.
Use the year the envelope was built or substantially upgraded. This helps HUS judge likely insulation and leakage.
This sets preliminary outdoor design temperatures. HUS will verify exact design conditions for a formal report.
Whole-home gives one block load. Room-by-room is needed later for room airflow, zoning and detailed design.
Why it matters

Square footage alone is not enough to size HVAC equipment

Window area and orientation, insulation, air leakage, ceiling height, attic conditions, duct location, ventilation and the local design temperature can materially change both heating and cooling loads. Two homes with the same floor area can need very different equipment.

Oversized systems can short-cycle and make zoning harder. Undersized systems can struggle at design conditions. A proper load calculation gives the contractor a better starting point for equipment selection and airflow planning.

FAQ

Manual J calculator questions

Is this an official ACCA Manual J report?

No. The online result is a preliminary planning estimate. Formal Manual J documentation should be produced with approved software using verified project inputs.

Can this help size a heat pump?

Yes, the heating and cooling estimates are useful for planning. Final heat-pump selection also requires manufacturer performance data at the applicable outdoor design temperatures.

Why do ducts matter?

Ducts in a hot attic or vented crawlspace can add meaningful distribution losses. Leakage, insulation and static-pressure limitations should be verified before final equipment or zoning decisions.

What happens after I verify my phone?

The result unlocks on screen and the same preliminary Manual J-style report is emailed to you and to HUS. The standard Planner Blueprint email is not used for this calculator.

What if I do not know a technical answer?

Choose I don't know. The calculator uses a reasonable planning assumption, records that assumption in the report and tells HUS what must be verified before any formal Manual J or final equipment selection.